About Us

We do our best to earn your business through clear and consistent communication, a commitment to staying on time and on budget, and the proven expertise to create the ideal backyard for you and your family.

You should expect to feel like our only client throughout the process. Our design consultant will take the time to build a detailed digital 3D model of your project, and walk through each feature, answering any and all questions along the way. Your dedicated project manager will be available to address any concern you have on-site. After your pool installation, we’re only a phone call away.

about-us-img

Pool Build

THEPROCESS

1

EXCAVATION

Your backyard will NEVER be the same! This is the most exciting part of the pool build! We finally get to dig a giant hole in your backyard! Warning: It’s MESSY! 

 
*Please talk to your neighbor and let them know it will be over soon!

2

REBAR

Once we have fully excavated your pool then we come the following day to bend some rebar! This is when the skeleton and the structural element of your project is performed. Our crews are amazing. They bend bar like butter, and they make sure all rebar is properly spaced, and able to pass any inspection. Our rebar is all made in America!

3

PLUMBING

This is where we will dig the ‘runs’ for our plumbing 18”-20” below grade.! But… it’s a mess & it takes a lot of work, but the plumbing is the heartbeat of any pool. Any pool can look good, but can it run well? We make sure all plumbing is pressure tested & up to code on every project.

4

SHOTCRETE

This part of the process is LOUD! We park on the street and need to use a compressor/pump all day so we can shoot the shotcrete at over 4000 PSI. That way the shotcrete can be shot into the empty pool shell, stick, bond, and become a solid concrete shell! After we are done, then you can walk into your pool the next day! The shape is done!

5

TILE & COPING

Now we start to add some color into the backyard. This phase is all done by our masons by hand, So it takes longer than the other phases. Each tile is set with precision! Waterproofing, cutting tile and properly setting grout is so important to any project.

6

DECKING
This is the process when we level out all of the messy dirt that is laying around. We grade it out, tamp it down, add deck drains and then lay whatever type of decking you have chosen with our designers. This part is the BIG reveal!

7

PLASTER

This is a 2-day process. On day 1 we clean out the messy pool shell. ON day 2 we apply the pebble plaster. AND THEN we begin filling it with water! Once it’s full, turn off the hose & then the brushing begins!

8

The Brushing Process
(Homeowner’s Responsibility)

Now that your pool has been filled and the water is under filtration you will be required to brush the plaster surface a minimum of twice a day and run the filter while the water is cloudy to help remove any plaster dust. This process should be done daily until all plaster dust has been filtered out (process takes approximately 15 days).
This will help ensure that your pool surface remains smooth & clean, If you have any questions, please give us a call.
DO NOT SWIM IN YOUR POOL UNTIL IT IS FULL> DO NOT ALLOW PETS ON THE FRESH PLASTER.